High Pressure Chemical Synthesis Reactor

    Project: Research

    Project Details

    Description

    Funding was provided for a refurbishment of the 20 kbar high pressure reactor at the RSC, which was not functional after 20 years of almost constant operation. The refurbishment and compliance was carried out within the Engineering workshop at the ANU. All funding from MEC was used, and the RSC supplemented the MEC funding above the promised level, when unexpected additional costs of fabrication were incurred. The refurbished instrument has been in constant use and continues to serve as an important unit within the RSC.
    StatusFinished
    Effective start/end date10/04/1831/12/18

    Fingerprint

    Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.