Project Details
Description
The aims of the project are to explore which combined low- to mid temperature pyrometallurgical-hydrometallurgical, pyrometallurgical-dry magnetic separation (DMS), and low-temperature fluidised-bed magnetisation roasting (FBMR)-hydrometallurgical and FBMR-DMS flow sheet options powered by renewables might have the potential to upgrade Pilbara BID, CID and DID fine iron ores to >65 % Fe and preferably >67% Fe.
Status | Finished |
---|---|
Effective start/end date | 1/06/23 → 31/05/24 |