Project Details
Description
This project aims to (A1) collect data on the costs of variable-rate industrial processing, (A2) model the cost of various configurations of integrated energy sources plus storage (VRE-ES) and (A3) to evaluate operating strategies that combine variable-rate production (VRP) with the suitably optimised VRE-ES energy systems, to provide overall lowest-cost decarbonised heavy industrial products.
| Status | Finished |
|---|---|
| Effective start/end date | 1/06/23 → 30/11/24 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.