Project Details
Description
The project aims to stand up initial models of three different thermal energy storage systems, with charging via electrical heaters, and discharging as process steam. The models will be refined based on earlier ANU models, in order to accommodate Rio Tintos upstream electricity network modelling and constraints, downstream steam requirements, and the physics of two packed-bed TES technologies and one two-tank molten salt TES technology.
Status | Finished |
---|---|
Effective start/end date | 19/06/23 → 5/09/23 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.