An engineering approach for project scoping

Ofer Zwikael*, John Smyrk

*Corresponding author for this work

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    3 Citations (Scopus)

    Abstract

    Benefit realization is becoming a critical performance criterion measure for project success. However, the mechanism through which outputs eventually become outcomes has not yet been identified. This paper proposes that an output utilization mechanism is needed to explain the cause and effect relationship between a project's outputs and target outcomes. The paper describes such a utilization mechanism, and discusses its role in the generation of target outcomes. By expanding on the concept of output utilization, the paper suggests the utilization map as a new tool for project scoping.

    Original languageEnglish
    Title of host publication2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
    Pages2135-2137
    Number of pages3
    EditionPART 3
    DOIs
    Publication statusPublished - 2011
    Event2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011 - Changchun, China
    Duration: 3 Sept 20115 Sept 2011

    Publication series

    Name2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
    NumberPART 3

    Conference

    Conference2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
    Country/TerritoryChina
    CityChangchun
    Period3/09/115/09/11

    Fingerprint

    Dive into the research topics of 'An engineering approach for project scoping'. Together they form a unique fingerprint.

    Cite this