TY - JOUR
T1 - Anatomy of interactions among risk factors influencing implementation of building information modeling (BIM)
T2 - a system dynamics approach
AU - Zarghami, Seyed Ashkan
N1 - Publisher Copyright:
© 2023, Emerald Publishing Limited.
PY - 2023
Y1 - 2023
N2 - Purpose: The overarching objective of this paper is to examine the cause–effect relationships among building and information modeling (BIM)-related risk factors and their impact on the implementation of BIM in construction projects. Design/methodology/approach: This paper draws on previous research to identify and categorize BIM-related risk factors. It then develops a system dynamics (SD) model to examine the cause–effect relationships among these factors leading to issues in BIM implementation. Findings: The proposed SD model illustrates how nine reinforcing feedback loops provide connections between four categories of risks, namely, technical, information, legal and organizational risks and, consequently, create vicious cycles that threaten the successful implementation of BIM. Originality/value: This paper is among a few studies that depart from reductionism by taking a holistic approach and demonstrating how the interactions between BIM-related risk factors lead to vicious cycles that threaten the successful implementation of BIM.
AB - Purpose: The overarching objective of this paper is to examine the cause–effect relationships among building and information modeling (BIM)-related risk factors and their impact on the implementation of BIM in construction projects. Design/methodology/approach: This paper draws on previous research to identify and categorize BIM-related risk factors. It then develops a system dynamics (SD) model to examine the cause–effect relationships among these factors leading to issues in BIM implementation. Findings: The proposed SD model illustrates how nine reinforcing feedback loops provide connections between four categories of risks, namely, technical, information, legal and organizational risks and, consequently, create vicious cycles that threaten the successful implementation of BIM. Originality/value: This paper is among a few studies that depart from reductionism by taking a holistic approach and demonstrating how the interactions between BIM-related risk factors lead to vicious cycles that threaten the successful implementation of BIM.
KW - Building information modeling (BIM)
KW - Causal loop diagram
KW - Construction projects
KW - Risk factors
KW - System dynamics
UR - http://www.scopus.com/inward/record.url?scp=85158148168&partnerID=8YFLogxK
U2 - 10.1108/ECAM-01-2023-0011
DO - 10.1108/ECAM-01-2023-0011
M3 - Article
SN - 0969-9988
JO - Engineering, Construction and Architectural Management
JF - Engineering, Construction and Architectural Management
ER -